passion_adj_02.jpg
156 1/4 scale fractals detailed and welded into "pairs"
78 fractal "pairs" lined up for fabbing into 1/4 scale editions
Machining full-scale fractals to recieve anchorage inserts
If you can't take the piece to the drill press, then take the drill press to the piece
Tack welding the fractals into "pairs"
IMG_5117.jpg
Welding up the three fractal "pairs" that constitute the base of Tango
Fully welded base
Opening up the holes on the underside of the base for threaded inserts
Stainless steel threaded inserts set plumb to level for tack welding
IMG_5127.jpg
Stainless steel insets welded to steel sculpture with 309 rod
Re-tapping insert threads post welding
Setting up the first fractal "pair" to be welded to the base assembly
Base assembly flipped over and second fractal "pair" set for welding
Third fractal "pair" clamped into place and ready for welding
Back down on the floor with fourth fractal "pair" tack welded into place - 140lbs of steel welded, only 120lbs more to go
Welding up the lower "valleys" before the piece gets too big to flip over
Positioning the fifth fractal "pair" for welding
IMG_5146.jpg
IMG_5147.jpg
IMG_5149.jpg
Adding more fractal "pairs" and welding as I go
IMG_5155.jpg
IMG_5156.jpg
IMG_5158.jpg
All tack welded togeter except for the final two fractal "pairs"
Heating up tack welds to make some final adjustments before fully welding things up
"valley" welding
...and more "valley" welding
220lbs of steel fully welded, only 40lbs more to go
Last two fractal "pairs' in position for welding
Fully welded sculpture
IMG_5192.jpg
Should've signed the base before building upward
IMG_5197.jpg
Over to a friend's heated shop for painting
IMG_5201.jpg
Glazing and sanding
IMG_5206.jpg
Priming
IMG_5208.jpg
Getting a head start on the "valley" color
IMG_5211.jpg
First full color coat
IMG_5213.jpg
Third full color coat
IMG_5217.jpg
Back home at my studio with four full coats of color
passion_adj_02.jpg
prev / next